Project Name:
Design, Supply, Installation and Commissioning of 123 kWp Roof-Top Solar Photo-Voltaic System.
Country and Location within the country:
Jordan; Amman
Client:
Central Electricity Generating Company
Program Time Frame
System Construction
Dec 2015 – Jan. 2016
System Operation
Feb. 2016
Narrative Description of the Project:
EcoSol has installed 123 kWp of PV system for the Headquarters of the Central Electricity Generation Company (CEGCO) at Amman- Khalda. The system was installed on a local designed and fabricated Carbon steel mounting structure at 7 degrees tilt angle. The system is expected to generate 220,430 kWh/year (1798 kWh/kWp). The system is expected to save about 65% of CEGCO Annual electrical energy bill.
Copyright © 2024 ECOSOL. Powered by: TenderJO